New developments
Control is drawn into the electrical design before the first wall goes up.
Bus-based control designed into the electrical drawings. The right solution for new developments, large floor plates, and infrastructure designed to operate for decades.
When wired is right
Control is drawn into the electrical design before the first wall goes up.
Distances and device counts where a bus is simply the more stable choice.
Infrastructure designed to operate for decades, not product cycles.
At a glance
Compare
Three ways to build the same intelligence. The right one depends on the site, not the brochure.
Bus-based control designed into the electrical drawings. The right solution for new developments, large floor plates, and infrastructure designed to operate for decades.
Deployed into occupied buildings and active public spaces without opening walls. Ideal where the environment is finished and disruption must remain near zero.
Wired backbone for critical infrastructure, wireless at the edges. The practical choice for phased developments and mixed-use developments.
Takkah Solutions
Tell us about the site — a villa, a tower, a district or a whole city — and our team will come back to you.