Skip to content

05ProjectsSmart city · Hybrid

District operations platform

Street lighting, surveillance, parking and environmental sensing for a new district, operated from one control room.

IllustrativeCase studies are being prepared with our clients. Until they are published, these references show the shape of a typical deployment — sector, delivery model and systems — not a specific client, site or result.

01The challenge

A new district planned with separate contractors for lighting, cameras and parking would have handed its operator four systems, four dashboards and no shared data.

02The approach

One platform specified from the start: a wired backbone for critical infrastructure, wireless sensing at the edges, and a single control room for monitoring, coordinating departments and responding to incidents.

03Gallery

District operations platform

Representative imagery until project photography is published.

A connected district at night
01A connected district at night
An operations room for the district
02An operations room for the district
Street lighting reporting pole by pole
03Street lighting reporting pole by pole

Deliverables

Deliverables
5 deliverables

  1. 01Adaptive street lighting with fault reporting
  2. 02Camera network across streets and shared spaces
  3. 03Smart parking and guidance
  4. 04Air quality and noise monitoring
  5. 05Unified control room

Systems

Systems

Smart LightingRemote and scheduled control indoors and on the street, with daylight and presence response.
SurveillanceCamera networks across streets and shared spaces with remote viewing, recording, and instant alerts.
NetworksStructured cabling, wireless access points, and managed coverage without dead zones, indoors or district wide.

Takkah Solutions

Let's build something
that thinks.

Tell us about the site — a villa, a tower, a district or a whole city — and our team will come back to you.